A plumbing estimating workflow that turns takeoff, labor units, fixture counts, markups, and alternates into a clean bid number and a proposal you can actually send.
Save Estimate
Free version — nothing is saved here. Print, copy, or download your proposal and take it with you. Hit Save Estimate and you'll land on the client portal wallet — the full version there saves your estimates, job history, and project files.

Project information

Estimating workflow

Organize

Capture the job data: drawings, fixture counts, pipe quantities, exclusions, alternates, and proposal number.

Optimize

Apply company labor units, material multipliers, production factors, and markups before the number becomes a promise.

Scale

Compare estimated hours to actual hours, save the lesson, and feed the next bid before the same mistake shows up with a new project name.

Proposal-ready

Turn the estimate into a clean scope, total price, alternates, exclusions, terms, and acceptance block.

Pipe material + labor takeoff

Built with a legacy unit-price structure: system, size, material cost, PHCC labor, adjusted labor. Update multipliers and rates to match today’s shop book.

SystemSizeDescriptionQtyUnitMat $/UnitLabor Hrs/UnitFactorMaterialHours

Plumbing fixture counter

Fixture labor is split into phases so a water closet is not treated like one magic line item. Rough, test, set, final, punch — the field has to visit more than once.

Fixture / AssemblyQtyRough HrsTest/Insp.Set/Trim HrsFinal/PunchMat Allow.MaterialHoursUnit Price (F&I)Install-OnlyCustomer SuppliesLine Total

Unit-priced rows: cost = qty × the unit price (or the install-only price when Customer Supplies is checked), fed straight into direct cost — no material multiplier, no labor burden on top. Hours on unit rows still feed the schedule; cost uses the unit price, so labor is never double-charged. Rows without a unit price use the hours + material build-up as before. Starter unit prices are editable per row — adjust them to your market.

Labor, material, overhead + profit

Add alternates + owner options

Pick a professional alternate from the dropdown, click Add Alternate, then edit the labor, material, sub/other, or lump-sum amount to fit the actual job. Water Management Plan and Water Demand / Right-Sizing Review are built in as one-click options.

Quick alternate menu
Choose the option you want to carry separately instead of hiding it inside the base bid.
Tip: quick alternates help separate owner-value items from the base bid: Water Management Plans, right-sizing reviews, BIM coordination, surveys, phasing, closeout support, and other scope that should not get buried.
TypeCategoryDescriptionLabor HrsMaterialSub/OtherLump SumPrice

Smooth Estimator Proposal

Proposal generator